3.11.2008

The Foundation Slab is DONE!


Chanda and his crew finished the foundation slab! The volume of concrete already poured is about 50% of the total water gate concrete volume and they finished a month ahead of schedule!

1 comment:

豪豪 said...

Can i have some water pipe and water meter picture from the Cambodia which available in Cambodia.I am one of the student from Edith Cowan University(Australia) which join the EWB project and i need to have some information about that . If I can get some more information about the water system in Cambodia that was great.Thank You very much. my email is unknownmaster1@gmail.com.