7.14.2008

Excavating the downstream path

ceda watches as a local villager excavates the channel

Excavation for the downstream path have begun. This path will guide the water from the watergates back to the existing O'Tabet stream. Manual labor was the best alternative considering costs and safety. At this point, the ground is saturated due to the rainy season, and having any heavy equipment out on site can be unstable. Work is estimated to be complete by next week.

No comments: