Excavation of the existing embankment for the watergate began about one week ago. Much progress has been made since. The crest elevation is currently at ~6.4m, and excavation will continue down to ~2.0m. As shown above, the watertable is at ~3.4m, thus, dewatering will need to be performed to have a dry working area.
11.28.2007
Embankment Excavation
Excavation of the existing embankment for the watergate began about one week ago. Much progress has been made since. The crest elevation is currently at ~6.4m, and excavation will continue down to ~2.0m. As shown above, the watertable is at ~3.4m, thus, dewatering will need to be performed to have a dry working area.