Embankment Excavation

Excavation of the existing embankment for the watergate began about one week ago. Much progress has been made since. The crest elevation is currently at ~6.4m, and excavation will continue down to ~2.0m. As shown above, the watertable is at ~3.4m, thus, dewatering will need to be performed to have a dry working area.