11.16.2007

Soil Moisture Content

It took about a week and a half to prepare the site for construction but the embankment repair work has resumed. This photo is of our compactor with the sheepsfoot roller towed behind. Our design specifies a soil type and tight range for moisture content for the new fill material. However, with the rainy season just ending the water table elevation is still very high and we are still getting rained on a few times a week so obtaining the correct moisture content has been difficult. But Narith has been able to stay ahead of construction by excavating and spreading the soil to dry before it is compacted.