6.05.2008

Complete With The Cherry Topping

The concrete work on the watergate have been completed last week, and now backfilling to both wingwalls are done! Topped off with a little color, the red beam is part of the control assembly to open and close the two gates. Hats off to all the field crew!

No comments: