before: March 2007, view from breach, looking east into reservoir
after: view from the gate controls, looking east into the reservoir
A first glimpse of impounding water in the resevoir. It's now (has been) a race to pull everything together for completion before the rain really hits. There are still a few outstanding items, such as finalizing on the downstream path, grassing of the remaining embankment, and rip-rap lining critical areas to prevent erosion.
1 comment:
Nice post WiL. I like the before and after. Speak Soon.
Bouny
Post a Comment